IELTS Reading Practice Test 2 · Passage 1
The Great Stink
How a hot summer gave London a new sewer system
In the summer of 1858, London experienced a crisis that became known as the Great Stink. For decades, the city's waste had flowed through drains and old streams directly into the River Thames, which was also the main source of drinking water for many Londoners. The problem had grown worse with the spread of the flushing toilet, which greatly increased the amount of water, and therefore sewage, entering the river. In June and July of that year, unusually high temperatures caused the waste lying along the riverbanks to rot in the sun, and the smell became so overpowering that people living and working near the river could hardly bear it.
Nowhere was the smell felt more strongly than in the Houses of Parliament, which had recently been rebuilt beside the river at Westminster. Curtains soaked in chloride of lime* were hung at the windows in an attempt to block the odour, and members discussed moving the business of government to Oxford or another town outside London. Newspapers mocked the politicians, who had ignored the condition of the river for years and now found themselves suffering from it. Within weeks, Parliament passed a law giving the Metropolitan Board of Works the power and the money to solve the problem, and the task was handed to its chief engineer, Joseph Bazalgette.
At the time, most doctors believed that diseases such as cholera were spread by 'miasma', or bad air, rising from rotting matter. Cholera had killed tens of thousands of Londoners in a series of epidemics since 1832. A few years earlier, the doctor John Snow had shown that an outbreak in Soho was linked to a single public water pump, and he argued that the disease was carried in dirty water rather than in the air. His conclusions were not widely accepted, however, and it was the fear of foul air, not contaminated water, that persuaded the authorities to act. Ironically, by taking sewage away from the river, the new system would also deal with the real cause of the disease.
Bazalgette's plan was to catch the sewage before it reached the Thames. He designed a network of large brick tunnels running parallel to the river on both its north and south banks, which collected the waste from the existing smaller sewers flowing down towards it. These intercepting sewers sloped gently towards the east, so that gravity carried the waste away from the centre of London. In low-lying areas, pumping stations raised the sewage to a higher level so that it could continue its journey. Finally, it was stored in large reservoirs at Beckton on the north bank and Crossness on the south, well beyond the city, and released into the river when the tide was flowing out to sea.
The scale of the project was enormous. About 132 kilometres of intercepting sewers were constructed, together with some 1,800 kilometres of smaller street sewers, and the work is estimated to have used 318 million bricks. Bazalgette chose to use Portland cement, a relatively new material that was stronger than traditional mortar and set hard even under water, and he insisted that every batch delivered to the sites was tested for strength. He also made a famous decision about the size of the pipes. Having calculated the diameter needed for the expected population, he doubled it, reasoning that the work would only be done once. This decision allowed the system to cope with London's growth for well over a century.
Part of the northern system was placed inside a new embankment built out into the Thames. The Victoria Embankment, completed in 1870, reclaimed a strip of land from the river and carried a wide road and public gardens above the sewer. Beneath the road, alongside the sewer, ran a tunnel for one of the city's new underground railways. Two other embankments, the Albert and the Chelsea, were also built during this period.
The main system was officially opened in 1865 by the Prince of Wales at the Crossness pumping station, although building work continued for another ten years. Its benefits soon became clear. When cholera struck London again in 1866, most of the deaths occurred in a part of the East End that had not yet been connected to the new sewers, a pattern that persuaded many doctors that Snow had been right. It was the last major outbreak of the disease in the city.
Bazalgette's sewers are still in use, but they have begun to show their age. Because the same pipes carry both sewage and rainwater, heavy storms can overload them, and to prevent waste from flooding streets and homes, the excess is released into the Thames through overflow points. By the early twenty-first century, this was happening dozens of times a year. In response, a 25-kilometre tunnel has been built deep beneath the river to capture these overflows and carry them to a treatment works in the east. Known as the Thames Tideway Tunnel, it is often described as the most important addition to London's sewers since Bazalgette's day.
- chloride of lime*
- a chemical powder used for bleaching and disinfecting